Yesterday morning the Ironworkers were loading more steel onto the barge they are building the caisson on. The caisson is the internal reinforcement for the bridge pier which will be lowered into the steel casing before the concrete is poured. The size and amount of steel that goes into one of these caissons is incredible. The horizontal elements in this caisson are at least two inches in diameter while the rings around it are close to one inch in diameter. Loading the steel onto the barge is a very controlled process that requires coordination among the ironworkers on the barge and the crane operator to accomplish safely and efficiently. The man in the photo is communicating with hand signals to the crane operator to lower the load onto the steel beams that will support it while it is on theā€¦